Skip to main content

Hi there


I'm trying to describe quite a long process in BPMN with 6 vertical swim lanes moving down through landscape A4 pages. 


I've put my swim lanes on a master page and can use that method to see them on all pages I make. 


However if I create the new pages and apply the master I can't drag a connector between pages. 


If I use the suggested method of carrying on a flow between pages which is to use auto-tiling I can connect my flow but not apply the master page on to the automatically created pages.  


Is there a way to do both? 


Thanks


Maya

Hi Maya


Thanks for posting in the community. Unfortunately I do not think there is a way to do both. However if adding this functionality would be useful for you please let us know via our feature request form


Reply