Skip to main content
Feb 5, 2024 5:47 PM UTC
Idea

Lock entire diagrams by status to stop edits

Related products:Lucidchart

Hello,

As the title suggests, is there a way to lock completed diagrams to remove the risk of someone on our team (including myself) from accidentally editing? I have seen other posts about changing the status to “approved” or “completed” but this does not prevent editing from my experience. 

Comments

Ambar D
Lucid community team
Dec 8, 2025 9:41 PM UTC

Hi ​@Walther, thanks for adding to this thread and letting us know what you’d like to see in this experience!

As you mentioned, locking objects in your diagram is currently the most straightforward workaround. Another option is to adjust sharing permissions for a specific document, as described in this article, to view-only if you’d like for collaborators to view your document without editing. 

The last item I wanted to mention is that is that the Process Accelerator accomplishes something similar to this request. Published documents in a repository are ‘locked’ in a way, because they can not be modified without approval. You can create approval workflows so that end-users must submit edits as a request that is sent for approval. The process manager or repository owner then review and approve/deny the changes.

While I know these are workarounds for this request, I wanted to mention them in case they help you or any other users who come across this post!

Thanks again for taking the time to leave this feedback.

Translate
Fklein23
Apr 13, 2026 5:08 PM UTC

I have a use case that REALLY needs there to be a way to freeze a version of a LucidChart document:

 

I have a very LARGE LucidChart document which is divided up into over 20 pages, so far.

In it,  each page has one or more state charts that controls one of numerous processes in a complex medical device design. There are over 1000 individual items in the diagram, so the workaround of locking individual components is not feasible.

I create lots of hyperlinks, which allow the user to navigate within the design without having to rely on the find function.

I only share this document to my team as “view-only”, but because I used hyperlinks to assist the viewer with navigation, if I use one of those hyperlinks to go to another location within this diagram, it often takes me to the same process or state in an obsolete version, because these links are absolute links, not relative links (which would be MUCH more useful).

Since I do not freeze my own access to the diagrams, this runs the risk that I will use one of those hyperlinks to navigate to a process in my current drawing to make a change. If I don’t pay very close attention, this link will take me to an obsolete version and I will make the change, thus contaminating the older drawing and not making the desired change in my current drawing. 

I realize that part of the problem is that I am using static links with respect to which drawing they point to, and this is  the real root of the problem. But if the obsolete drawing were frozen and when I tried to change it, I would get a warning I would correct the link and the overall problem would be moot.

It would be better if LucidChart could find every hyperlink for me so I can update these links when I graduate to a new version of the overall document. It would be better yet if I could specify relative links that only target locations in the current drawing. So this way, when I “Save a Copy” to move to the next version of the design, I don’t have to worry that my links are going to a down-rev version of the drawing. But since neither of these options are available in LucidChart, it seems to me that the easiest way to achieve a minimum acceptable upgrade to LucidChart to fix my problem is to make the entire drawing frozen and not changeable by anyone.

Translate
Franklin J. Rudolph, Ph.D., P.E.
Zuzia S
Lucid community team
Apr 21, 2026 1:10 PM UTC

​@Fklein23 thank you so much for leaving these additional details and feedback, along with your example. Your comments here are helpful to our product teams as they continue to research new product features and enhancements.

Another idea that has been submitted in the Community and is similar to what you have described is the following:

Please do not hesitate to show your support under that post as well. 

Thank you again for sharing your feedback!

Translate
Apr 30, 2026 5:28 PM UTC

Hi, I also am effectively looking for a setting that when the document is in approved status, then all the objects etc, of the diagram and all tabs in that diagram file are locked.

Translate
Zuzia S
Lucid community team
May 8, 2026 11:26 AM UTC

Thank you for adding your feedback to this thread ​@Sara Olguin! I can certainly see how this would be beneficial for your workflow.  

Translate