We are getting this error message for a Lucidchart assignment in a live section in Canvas. The Lucidchart assignment was setup in a blueprint and then synced over to the live section. Does this error mean that every time we sync blueprint content to a live section that has Lucid, we will have to open it and save it first every time before we do the sync? And if so, does the person who created the Lucid assignment in the Canvas blueprint have to open and sabe every time before the sync or can an admin do this too?

